Los Angeles department of building safty logo Permit and Inspection Report banner
6161 N SEPULVEDA BLVD 91411
APPLICATION / PERMIT NUMBER: 11010-10000-02552
PLAN CHECK / JOB NUMBER: B11LA13719

Plan Check and Permit Information


GROUP: Building
TYPE: Bldg-New
SUB-TYPE: Commercial
PRIMARY USE: (4) Gymnasium
WORK DESCRIPTION: NEW TYPE III-B, A-3 OCCUPANCY, 273'x204' ONE STORY GYMNASIUM.SEE COMMENTS.
PERMIT ISSUED: Yes PERMIT ISSUE DATE: 05/18/2012 ISSUING OFFICE: West LA
CURRENT STATUS: CofO Issued CURRENT STATUS DATE: 04/17/2013

Permit Application Status History
Submitted 12/16/2011 APPLICANT
Assigned to Plan Check Engineer 01/26/2012 FARUK SEZER
Corrections Issued 02/06/2012 FARUK SEZER
Green Plans Picked Up 02/09/2012 APPLICANT
Quality Review Completed 02/13/2012 RUDOLF KINAR MELIKOFF
Building Plans Picked Up 02/15/2012 APPLICANT
Disabled Access Plans Picked Up 03/12/2012 APPLICANT
Applicant returned to address corrections 04/02/2012 FARUK SEZER
Applicant returned to address corrections 04/17/2012 FARUK SEZER
Applicant returned to address corrections 04/25/2012 FARUK SEZER
Applicant returned to address corrections 04/26/2012 FARUK SEZER
Plan Check Approved 05/18/2012 FARUK SEZER
Issued 05/18/2012 LADBS
CofO in Progress 04/17/2013 TERRY DRIBIN
Permit Finaled 04/17/2013 ANDREW CROMER
CofO Issued 04/17/2013 ANDREW CROMER
Permit Finaled 04/17/2013 ANDREW CROMER

Permit Application Clearance Information
Hydrant and Access approval Cleared 02/16/2012 LYNN MC CLAIN
Site Plan review Cleared 03/13/2012 DARYLL MACKEY
Address approval Cleared 03/16/2012 CUC NGUYEN
Roof/Waste drainage to street Cleared 03/16/2012 JOHN LIN
Work Adjacent to Public Way Cleared 03/16/2012 JOHN LIN
Eng Process Fee Ord 176,300 Cleared 03/21/2012 AVALYN KAMACHI
Prkng lot landscape/Water mgmt Cleared 03/27/2012 BRIDGETTE WOOTEN
Sewer availability Cleared 04/09/2012 BERTRAM MOKLEBUST
Driveway location Cleared 04/12/2012 VICENTE CORDERO
Highway dedication Cleared 04/12/2012 BERTRAM MOKLEBUST
Internal circulation Cleared 04/12/2012 VICENTE CORDERO
Permit Cleared 04/12/2012 CHRISTINE KEUSHGUERIAN
Public Swimming Pool approval Cleared 04/17/2012 LACDHS APPROVED
Stormwater Pollution Mitigatn Cleared 04/17/2012 KOSTA KAPORIS
Title 19 building approval Cleared 05/16/2012 DAVE MYERS
DAS Clearance Cleared 05/17/2012 WAI LAU
Green Code Cleared 05/17/2012 ALDO UBAU

Licensed Professional/Contractor Information
Architect Information
Budetti, Robert Peter Jr; Lic. No.: C23757
11 ASHWOOD
IRVINE, CA  92604
Contractor Information
Sepulveda Commercial Development Corp; Lic. No.: 780714-B
2048 2ND STREET
NORCO, CA  928604101
Engineer Information
Cords, Donald Alan; Lic. No.: GE2529
3553 TEXAS ST
SAN DIEGO, CA  92104
Engineer Information
Schroeder, Mark Ernest; Lic. No.: S4110
16969 VON KARMAN AVE 240
IRVINE, CA  92606

Inspection Activity Information

Inspector Information
CAMERON CHABAN, (818) 374-1128
Office Hours: 7:00-8:00 AM MON-FRI
ROBERT DAVIS, (818) 374-1128
Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspection Request(s)
  No data available

Inspection Request History
  Deputy Reinf. Concrete   06/05/2012   No Access for Inspection   TERRY DRIBIN
  Footing/Foundation/Slab   06/05/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Barrier   06/05/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   06/05/2012   Not Ready for Inspection   TERRY DRIBIN
  SWPPP-Const. Storm Water   06/05/2012   Not Required   TERRY DRIBIN
  Deputy Reinf. Concrete   06/07/2012   Conditional Approval   GREGORY POMISH
  Excavation/Setback/Form/Re-Bar   06/07/2012   Partial Approval   GREGORY POMISH
  Deputy Reinf. Concrete   06/08/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   06/11/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   06/12/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   06/13/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Drilled-In Anchors   06/15/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   06/15/2012   Conditional Approval   GREGORY POMISH
  Masonry Wall/Backfill   06/15/2012   Partial Approval   GREGORY POMISH
  Deputy Reinf. Concrete   06/18/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Reinf. Masonry   06/18/2012   Partial Approval   TERRY DRIBIN
  Deputy Seismic Resistance   06/18/2012   No Access for Inspection   TERRY DRIBIN
  Masonry Wall/Backfill   06/18/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Concrete   06/19/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   06/19/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   06/19/2012   Partial Approval   TERRY DRIBIN
  METHANE-Barrier   06/19/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   06/19/2012   Not Ready for Inspection   TERRY DRIBIN
  Masonry Wall/Backfill   06/19/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Concrete   06/20/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   06/20/2012   Partial Approval   TERRY DRIBIN
  Masonry Wall/Backfill   06/20/2012   Partial Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   06/21/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   06/21/2012   Partial Approval   TERRY DRIBIN
  Green Building Rough   06/21/2012   Partial Inspection   PETER FOLLING
  METHANE-Rough   06/21/2012   Not Ready for Inspection   TERRY DRIBIN
  Reinforced Masonry Frame   06/21/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   06/22/2012   Approved   DANNY RODRIGUEZ
  Deputy Reinf. Masonry   06/22/2012   Approved   DANNY RODRIGUEZ
  Masonry Wall/Backfill   06/22/2012   Partial Approval   DANNY RODRIGUEZ
  Deputy Reinf. Concrete   06/25/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   06/25/2012   Conditional Approval   GREGORY POMISH
  Footing/Foundation/Slab   06/25/2012   Corrections Issued   GREGORY POMISH
  METHANE-Barrier   06/25/2012   Not Ready for Inspection   GREGORY POMISH
  METHANE-Subgrade   06/25/2012   Not Ready for Inspection   GREGORY POMISH
  Masonry Wall/Backfill   06/25/2012   Not Ready for Inspection   GREGORY POMISH
  Deputy Reinf. Concrete   06/26/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   06/26/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Concrete   06/27/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   06/27/2012   Conditional Approval   GREGORY POMISH
  Footing/Foundation/Slab   06/27/2012   Not Ready for Inspection   GREGORY POMISH
  METHANE-Barrier   06/27/2012   Not Ready for Inspection   GREGORY POMISH
  METHANE-Subgrade   06/27/2012   Partial Inspection   GREGORY POMISH
  Deputy Reinf. Concrete   06/28/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   06/28/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Concrete   06/29/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   06/29/2012   Conditional Approval   GREGORY POMISH
  Masonry Wall/Backfill   06/29/2012   Corrections Issued   GREGORY POMISH
  Deputy Reinf. Concrete   07/02/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   07/02/2012   Partial Approval   TERRY DRIBIN
  Masonry Wall/Backfill   07/02/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Concrete   07/03/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   07/03/2012   Partial Approval   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   07/03/2012   Not Ready for Inspection   TERRY DRIBIN
  Masonry Wall/Backfill   07/03/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   07/05/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   07/05/2012   Partial Approval   TERRY DRIBIN
  METHANE-Rough   07/05/2012   Not Ready for Inspection   TERRY DRIBIN
  Reinforced Masonry Frame   07/05/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Concrete   07/06/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   07/06/2012   Partial Approval   TERRY DRIBIN
  Masonry Wall/Backfill   07/06/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Concrete   07/09/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   07/09/2012   Partial Approval   TERRY DRIBIN
  Masonry Wall/Backfill   07/09/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Concrete   07/10/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   07/10/2012   Partial Approval   TERRY DRIBIN
  Masonry Wall/Backfill   07/10/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Concrete   07/11/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Reinf. Masonry   07/11/2012   No Access for Inspection   TERRY DRIBIN
  Footing/Foundation/Slab   07/11/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Barrier   07/11/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   07/11/2012   Not Ready for Inspection   TERRY DRIBIN
  Masonry Wall/Backfill   07/11/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   07/12/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   07/12/2012   Conditional Approval   GREGORY POMISH
  Masonry Wall/Backfill   07/12/2012   Corrections Issued   GREGORY POMISH
  Deputy Reinf. Concrete   07/13/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   07/13/2012   Conditional Approval   GREGORY POMISH
  Excavation/Setback/Form/Re-Bar   07/13/2012   Partial Approval   GREGORY POMISH
  Deputy Reinf. Concrete   07/17/2012   Conditional Approval   STEVE WEIS
  Deputy Reinf. Masonry   07/17/2012   Conditional Approval   STEVE WEIS
  Deputy Reinf. Concrete   07/18/2012   Conditional Approval   STEVE WEIS
  Deputy Reinf. Masonry   07/18/2012   Conditional Approval   STEVE WEIS
  Deputy Reinf. Concrete   07/19/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   07/19/2012   Conditional Approval   GREGORY POMISH
  Masonry Wall/Backfill   07/19/2012   Not Ready for Inspection   GREGORY POMISH
  Deputy Reinf. Concrete   07/20/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   07/20/2012   Conditional Approval   GREGORY POMISH
  METHANE-Rough   07/20/2012   Not Ready for Inspection   GREGORY POMISH
  Reinforced Masonry Frame   07/20/2012   Partial Approval   GREGORY POMISH
  Masonry Wall/Backfill   07/23/2012   Partial Approval   TERRY DRIBIN
  Masonry Wall/Backfill   07/24/2012   Partial Approval   TERRY DRIBIN
  Masonry Wall/Backfill   07/25/2012   Partial Approval   TERRY DRIBIN
  Masonry Wall/Backfill   07/26/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   07/27/2012   Partial Inspection   TERRY DRIBIN
  METHANE-Barrier   07/27/2012   Partial Inspection   TERRY DRIBIN
  METHANE-Subgrade   07/27/2012   Partial Inspection   TERRY DRIBIN
  Masonry Wall/Backfill   07/27/2012   Partial Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   07/30/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   07/30/2012   Conditional Approval   GREGORY POMISH
  Excavation/Setback/Form/Re-Bar   07/30/2012   Partial Approval   GREGORY POMISH
  Deputy Reinf. Concrete   08/01/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   08/01/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Concrete   08/02/2012   Conditional Approval   GREGORY POMISH
  Deputy Reinf. Masonry   08/02/2012   Conditional Approval   GREGORY POMISH
  Footing/Foundation/Slab   08/02/2012   Partial Approval   GREGORY POMISH
  METHANE-Barrier   08/02/2012   Partial Inspection   GREGORY POMISH
  METHANE-Subgrade   08/02/2012   Partial Inspection   GREGORY POMISH
  Deputy Reinf. Concrete   08/03/2012   Conditional Approval   CAMERON CHABAN
  Deputy Reinf. Masonry   08/03/2012   Conditional Approval   CAMERON CHABAN
  Deputy Reinf. Concrete   08/10/2012   Conditional Approval   GREGORY POMISH
  Footing/Foundation/Slab   08/10/2012   Partial Approval   GREGORY POMISH
  METHANE-Barrier   08/10/2012   Not Ready for Inspection   GREGORY POMISH
  METHANE-Subgrade   08/10/2012   Not Ready for Inspection   GREGORY POMISH
  Deputy Reinf. Concrete   08/15/2012   Conditional Approval   GREGORY POMISH
  Footing/Foundation/Slab   08/15/2012   Partial Approval   GREGORY POMISH
  METHANE-Barrier   08/15/2012   Not Ready for Inspection   GREGORY POMISH
  METHANE-Subgrade   08/15/2012   Not Ready for Inspection   GREGORY POMISH
  Masonry Wall/Backfill   08/17/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   08/20/2012   No Access for Inspection   TERRY DRIBIN
  METHANE-Rough   08/20/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   08/20/2012   Partial Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   08/21/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   08/21/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   08/21/2012   Partial Inspection   TERRY DRIBIN
  METHANE-Barrier   08/21/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Rough   08/21/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   08/21/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   08/21/2012   Partial Inspection   TERRY DRIBIN
  Deputy Steel/Welding   08/22/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   08/23/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   08/23/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Barrier   08/23/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Rough   08/23/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   08/23/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   08/23/2012   Partial Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   08/24/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   08/24/2012   No Access for Inspection   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   08/24/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Rough   08/24/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   08/24/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   08/27/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   08/27/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   08/27/2012   Partial Approval   TERRY DRIBIN
  METHANE-Barrier   08/27/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   08/27/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   08/28/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   08/28/2012   Partial Approval   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   08/28/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   08/29/2012   Partial Approval   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   08/29/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Concrete   08/30/2012   Conditional Approval   GREGORY POMISH
  Deputy Steel/Welding   08/30/2012   Conditional Approval   GREGORY POMISH
  Excavation/Setback/Form/Re-Bar   08/30/2012   Partial Approval   GREGORY POMISH
  Footing/Foundation/Slab   08/30/2012   Partial Inspection   GREGORY POMISH
  METHANE-Barrier   08/30/2012   Partial Inspection   GREGORY POMISH
  METHANE-Subgrade   08/30/2012   Partial Inspection   GREGORY POMISH
  Deputy Reinf. Concrete   09/04/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   09/04/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   09/04/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   09/05/2012   Partial Approval   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   09/05/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   09/06/2012   Partial Approval   TERRY DRIBIN
  Deputy Wood Construction   09/06/2012   Partial Approval   TERRY DRIBIN
  Floor/Roof Diaphrgm/Shear Wall   09/06/2012   Partial Inspection   TERRY DRIBIN
  Masonry Wall/Backfill   09/06/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   09/07/2012   Partial Approval   TERRY DRIBIN
  Floor/Roof Diaphrgm/Shear Wall   09/07/2012   Partial Approval   TERRY DRIBIN
  Special/Order Compliance   09/07/2012   Approved   ANDREW CROMER
  Deputy Steel/Welding   09/10/2012   Partial Approval   TERRY DRIBIN
  Drywall Nailing   09/10/2012   Partial Approval   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   09/10/2012   Partial Inspection   TERRY DRIBIN
  Green Building Rough   09/10/2012   Not Ready for Inspection   BRYAN MEYER
  Deputy Reinf. Concrete   09/11/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Reinf. Masonry   09/11/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   09/11/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   09/12/2012   Partial Approval   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   09/12/2012   Partial Approval   TERRY DRIBIN
  METHANE-Rough   09/12/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   09/12/2012   Partial Inspection   TERRY DRIBIN
  Deputy Steel/Welding   09/13/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   09/14/2012   Partial Approval   TERRY DRIBIN
  Drywall Nailing   09/14/2012   Not Ready for Inspection   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   09/14/2012   Not Ready for Inspection   TERRY DRIBIN
  Light Gage Steel Frame   09/14/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Rough   09/14/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   09/14/2012   Not Ready for Inspection   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   09/17/2012   Partial Approval   JOHN KITCKO
  Light Gage Steel Frame   09/17/2012   Partial Inspection   JOHN KITCKO
  Deputy Reinf. Concrete   09/18/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Reinf. Masonry   09/18/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   09/18/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   09/19/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   09/20/2012   Partial Approval   TERRY DRIBIN
  Deputy Reinf. Masonry   09/20/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   09/20/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   09/20/2012   Partial Approval   TERRY DRIBIN
  METHANE-Barrier   09/20/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   09/20/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   09/21/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   09/24/2012   Partial Approval   TERRY DRIBIN
  METHANE-Rough   09/24/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   09/24/2012   Partial Inspection   TERRY DRIBIN
  Deputy Steel/Welding   09/25/2012   Partial Approval   TERRY DRIBIN
  METHANE-Rough   09/25/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   09/25/2012   Partial Inspection   TERRY DRIBIN
  Deputy Steel/Welding   09/26/2012   Partial Approval   TERRY DRIBIN
  Light Gage Steel Frame   09/26/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Rough   09/26/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   09/26/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   09/27/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   10/01/2012   Conditional Approval   STEVE WEIS
  Deputy Drilled-In Anchors   10/02/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   10/02/2012   No Access for Inspection   TERRY DRIBIN
  METHANE-Rough   10/02/2012   No Access for Inspection   TERRY DRIBIN
  Structural Steel Frame   10/02/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Drilled-In Anchors   10/03/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   10/03/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Drilled-In Anchors   10/04/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   10/04/2012   Partial Approval   TERRY DRIBIN
  Deputy Drilled-In Anchors   10/05/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   10/05/2012   Conditional Approval   TERRY DRIBIN
  Light Gage Steel Frame   10/05/2012   Partial Inspection   TERRY DRIBIN
  Deputy Steel/Welding   10/09/2012   Conditional Approval   CAMERON CHABAN
  Insulation   10/09/2012   Partial Approval   CAMERON CHABAN
  Deputy Steel/Welding   10/10/2012   Approved   JOHN KITCKO
  Light Gage Steel Frame   10/10/2012   Partial Approval   JOHN KITCKO
  Deputy Steel/Welding   10/11/2012   Partial Approval   TERRY DRIBIN
  Floor/Roof Diaphrgm/Shear Wall   10/11/2012   Partial Approval   TERRY DRIBIN
  Light Gage Steel Frame   10/11/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   10/12/2012   Partial Approval   TERRY DRIBIN
  Light Gage Steel Frame   10/12/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   10/15/2012   Partial Approval   TERRY DRIBIN
  Green Building Rough   10/15/2012   Not Ready for Inspection   BRYAN MEYER
  Light Gage Steel Frame   10/15/2012   Partial Inspection   TERRY DRIBIN
  METHANE-Rough   10/15/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   10/15/2012   Partial Inspection   TERRY DRIBIN
  Deputy Steel/Welding   10/16/2012   Partial Approval   TERRY DRIBIN
  METHANE-Rough   10/16/2012   Not Ready for Inspection   TERRY DRIBIN
  Structural Steel Frame   10/16/2012   Partial Inspection   TERRY DRIBIN
  Deputy Steel/Welding   10/17/2012   Partial Approval   TERRY DRIBIN
  Drywall Nailing   10/17/2012   Partial Approval   TERRY DRIBIN
  Light Gage Steel Frame   10/17/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   10/18/2012   Partial Approval   TERRY DRIBIN
  Drywall Nailing   10/18/2012   Partial Approval   TERRY DRIBIN
  Light Gage Steel Frame   10/18/2012   Partial Inspection   TERRY DRIBIN
  Wood Frame   10/18/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   10/19/2012   Partial Approval   TERRY DRIBIN
  Light Gage Steel Frame   10/19/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   10/22/2012   Partial Approval   TERRY DRIBIN
  Drywall Nailing   10/22/2012   Partial Inspection   TERRY DRIBIN
  Insulation   10/22/2012   Not Ready for Inspection   TERRY DRIBIN
  Light Gage Steel Frame   10/22/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   10/23/2012   Partial Approval   TERRY DRIBIN
  Insulation   10/23/2012   Partial Inspection   TERRY DRIBIN
  Light Gage Steel Frame   10/23/2012   Partial Inspection   TERRY DRIBIN
  Drywall Nailing   10/24/2012   Not Ready for Inspection   TERRY DRIBIN
  Green Building Rough   10/24/2012   Partial Inspection   PETER FOLLING
  Wood Frame   10/24/2012   Not Ready for Inspection   TERRY DRIBIN
  Drywall Nailing   10/26/2012   Partial Approval   JOHN KITCKO
  Light Gage Steel Frame   10/26/2012   Partial Approval   JOHN KITCKO
  Drywall Nailing   10/31/2012   Partial Inspection   TERRY DRIBIN
  Light Gage Steel Frame   10/31/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   11/01/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   11/01/2012   Partial Approval   TERRY DRIBIN
  METHANE-Barrier   11/01/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   11/01/2012   Not Ready for Inspection   TERRY DRIBIN
  Drywall Nailing   11/02/2012   Partial Approval   TERRY DRIBIN
  Interior/Exterior Lathing   11/02/2012   Partial Inspection   TERRY DRIBIN
  Insulation   11/05/2012   Partial Approval   CAMERON CHABAN
  Interior/Exterior Lathing   11/05/2012   Partial Approval   CAMERON CHABAN
  Drywall Nailing   11/06/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   11/06/2012   Partial Approval   TERRY DRIBIN
  Green Building Rough   11/06/2012   Partial Inspection   PETER FOLLING
  Interior/Exterior Lathing   11/06/2012   Partial Inspection   TERRY DRIBIN
  METHANE-Barrier   11/06/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   11/06/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   11/07/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   11/08/2012   Partial Approval   TERRY DRIBIN
  Drywall Nailing   11/08/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   11/08/2012   Partial Approval   TERRY DRIBIN
  Interior/Exterior Lathing   11/08/2012   Partial Approval   TERRY DRIBIN
  Light Gage Steel Frame   11/08/2012   Partial Approval   TERRY DRIBIN
  METHANE-Barrier   11/08/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   11/08/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   11/13/2012   Partial Approval   TERRY DRIBIN
  Drywall Nailing   11/13/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   11/13/2012   Partial Approval   TERRY DRIBIN
  Green Building Rough   11/13/2012   Partial Inspection   PETER FOLLING
  Interior/Exterior Lathing   11/13/2012   Partial Inspection   TERRY DRIBIN
  METHANE-Barrier   11/13/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   11/13/2012   Not Ready for Inspection   TERRY DRIBIN
  Wood Frame   11/13/2012   Approved   TERRY DRIBIN
  Deputy Steel/Welding   11/14/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   11/15/2012   Partial Approval   TERRY DRIBIN
  Drywall Nailing   11/15/2012   Partial Inspection   TERRY DRIBIN
  T-Bar Ceiling   11/15/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   11/16/2012   Partial Approval   TERRY DRIBIN
  Light Gage Steel Frame   11/16/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Reinf. Masonry   11/19/2012   Conditional Approval   STEVE WEIS
  Footing/Foundation/Slab   11/19/2012   Partial Inspection   STEVE WEIS
  Interior/Exterior Lathing   11/19/2012   Partial Approval   STEVE WEIS
  METHANE-Barrier   11/19/2012   Not Ready for Inspection   STEVE WEIS
  METHANE-Subgrade   11/19/2012   Not Ready for Inspection   STEVE WEIS
  Deputy Steel/Welding   11/26/2012   Approved   WILLIAM THOMPSON
  Deputy Reinf. Concrete   11/27/2012   Partial Approval   TERRY DRIBIN
  Deputy Steel/Welding   11/27/2012   Partial Approval   TERRY DRIBIN
  Footing/Foundation/Slab   11/27/2012   Partial Approval   TERRY DRIBIN
  Interior/Exterior Lathing   11/27/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Barrier   11/27/2012   Not Ready for Inspection   TERRY DRIBIN
  METHANE-Subgrade   11/27/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Shotcrete   11/28/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   11/28/2012   No Access for Inspection   TERRY DRIBIN
  Interior/Exterior Lathing   11/28/2012   Partial Approval   TERRY DRIBIN
  Deputy Shotcrete   11/29/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   11/29/2012   No Access for Inspection   TERRY DRIBIN
  Interior/Exterior Lathing   11/29/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Seismic Resistance   11/30/2012   No Access for Inspection   TERRY DRIBIN
  Deputy Steel/Welding   11/30/2012   No Access for Inspection   TERRY DRIBIN
  Drywall Nailing   12/03/2012   Not Ready for Inspection   TERRY DRIBIN
  T-Bar Ceiling   12/03/2012   Not Ready for Inspection   TERRY DRIBIN
  T-Bar Ceiling   12/04/2012   Not Ready for Inspection   CAMERON CHABAN
  Deputy Steel/Welding   12/05/2012   Approved   WILLIAM THOMPSON
  Excavation/Setback/Form/Re-Bar   12/05/2012   Partial Approval   WILLIAM THOMPSON
  T-Bar Ceiling   12/05/2012   Partial Approval   WILLIAM THOMPSON
  Deputy Steel/Welding   12/06/2012   Approved   WILLIAM THOMPSON
  Excavation/Setback/Form/Re-Bar   12/06/2012   Partial Approval   WILLIAM THOMPSON
  Deputy Steel/Welding   12/07/2012   Partial Approval   TERRY DRIBIN
  Interior/Exterior Lathing   12/07/2012   Approved   TERRY DRIBIN
  Footing/Foundation/Slab   12/10/2012   Partial Approval   GREGORY POMISH
  METHANE-Barrier   12/10/2012   Partial Inspection   GREGORY POMISH
  METHANE-Subgrade   12/10/2012   Partial Inspection   GREGORY POMISH
  Deputy Steel/Welding   12/11/2012   Conditional Approval   GREGORY POMISH
  Excavation/Setback/Form/Re-Bar   12/12/2012   Partial Inspection   GREGORY POMISH
  Insulation   12/17/2012   No Access for Inspection   TERRY DRIBIN
  Footing/Foundation/Slab   12/18/2012   Partial Inspection   TERRY DRIBIN
  Light Gage Steel Frame   12/18/2012   Approved   TERRY DRIBIN
  Drywall Nailing   12/20/2012   Partial Approval   TERRY DRIBIN
  Floor/Roof Diaphrgm/Shear Wall   12/20/2012   Partial Approval   TERRY DRIBIN
  Green Building Rough   12/20/2012   Not Ready for Inspection   BRYAN MEYER
  Deputy Reinf. Concrete   12/26/2012   No Access for Inspection   TERRY DRIBIN
  Footing/Foundation/Slab   12/26/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   12/27/2012   No Access for Inspection   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   12/27/2012   Not Ready for Inspection   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   12/28/2012   Partial Approval   TERRY DRIBIN
  Interior/Exterior Lathing   12/28/2012   Partial Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   12/31/2012   No Access for Inspection   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   12/31/2012   Partial Approval   TERRY DRIBIN
  Floor/Roof Diaphrgm/Shear Wall   12/31/2012   Not Ready for Inspection   TERRY DRIBIN
  Deputy Reinf. Concrete   01/04/2013   No Access for Inspection   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   01/04/2013   Partial Approval   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   01/08/2013   Partial Approval   TERRY DRIBIN
  Green Building Rough   01/08/2013   Partial Inspection   PETER FOLLING
  Excavation/Setback/Form/Re-Bar   01/10/2013   Partial Approval   TERRY DRIBIN
  Excavation/Setback/Form/Re-Bar   01/14/2013   Partial Approval   TERRY DRIBIN
  Drywall Nailing   01/23/2013   Not Ready for Inspection   LARRY ARNICK
  Final   01/23/2013   Not Ready for Inspection   LARRY ARNICK
  Footing/Foundation/Slab   01/23/2013   Not Ready for Inspection   LARRY ARNICK
  Green Building Final   01/23/2013   Partial Inspection   PETER FOLLING
  Green Building Rough   01/23/2013   Corrections Issued   BRYAN MEYER
  METHANE-Final   01/23/2013   Not Ready for Inspection   LARRY ARNICK
  Reinforced Masonry Frame   01/23/2013   Not Ready for Inspection   LARRY ARNICK
  SGSOV-Seismic Gas S/O Valve   01/23/2013   SGSOV Not Ready   LARRY ARNICK
  SUSMP-Std. Urban Storm Water   01/23/2013   Not Ready for Inspection   LARRY ARNICK
  Smoke Detectors   01/23/2013   Not Ready for Inspection   LARRY ARNICK
  Structural Steel Frame   01/23/2013   Not Ready for Inspection   LARRY ARNICK
  Insulation   01/24/2013   Approved   TERRY DRIBIN
  Piling/Pier/Caisson   01/25/2013   Approved   TERRY DRIBIN
  Green Building Rough   01/28/2013   Approved   PETER FOLLING
  Green Building Final   01/29/2013   Partial Inspection   PETER FOLLING
  Drywall Nailing   02/01/2013   Approved   TERRY DRIBIN
  Final   02/01/2013   Partial Inspection   TERRY DRIBIN
  Footing/Foundation/Slab   02/01/2013   Approved   TERRY DRIBIN
  METHANE-Final   02/01/2013   Approved   TERRY DRIBIN
  Reinforced Masonry Frame   02/01/2013   Approved   TERRY DRIBIN
  SGSOV-Seismic Gas S/O Valve   02/01/2013   SGSOV Not Ready   TERRY DRIBIN
  SUSMP-Std. Urban Storm Water   02/01/2013   Not Ready for Inspection   TERRY DRIBIN
  Smoke Detectors   02/01/2013   Partial Inspection   TERRY DRIBIN
  Structural Steel Frame   02/01/2013   Approved   TERRY DRIBIN
  Reinforced Concrete Frame   02/13/2013   Partial Inspection   TERRY DRIBIN
  Final   02/20/2013   Partial Inspection   TERRY DRIBIN
  SGSOV-Seismic Gas S/O Valve   02/20/2013   SGSOV Approved   TERRY DRIBIN
  SUSMP-Std. Urban Storm Water   02/20/2013   Approved   TERRY DRIBIN
  Smoke Detectors   02/20/2013   Approved   TERRY DRIBIN
  Green Building Final   04/12/2013   Approved   BRYAN MEYER
  Final   04/16/2013   OK to Issue CofO   TERRY DRIBIN
  Special/Order Compliance   08/05/2013   Approved   TERRY DRIBIN

BACK     NEW SEARCH